Application of Certificate of Final Electrical Inspection as a requirement for Electrical Connection.
Office or Division: | OFFICE OF THE MUNICIPAL ENGINEER | |||
Classification: | Simple | |||
Type of Transaction: | G2C / G2B / G2G | |||
Who may avail: | All establishments that needs Final Electrical Connection | |||
CHECKLIST OF REQUIREMENTS | WHERE TO SECURE | |||
1. Electrical Permit Application Form and plan signed and sealed by Professional Electrical Engineer | CASURECO III and Professional Electrical Engineer | |||
2. Proof of Ownership of lot | Provided by the applicant | |||
3. Picture of the building | Provided by the applicant | |||
CLIENT STEPS | AGENCY ACTION | FEES TO BE PAID | PROCESSING TIME | PERSON RESPONSIBLE |
1. Client enters the office, register at the visitors log book and submits all necessary documents | Extends greetings to client, receives and verifies application form and documents | None | 5 minutes | Admin. Aide IV, Master Plumber, Draftsman I Admin Assistant. |
2. Sits at the lobby provided for clients and waits for further information | If documents are complete: Inform clients for the conduct of ocular inspection of the building If documents are incomplete: Returns all documents and provide necessary recommendation to comply with the required documents. | None | 45 minutes | Master Plumber and Draftsman I |
3. Receives Assessment, Pay at the Mun. Treasurer’s Office then go back to Mun. Engineers’ Office and give the Official Receipt | Assessment of fees based on the National Building Code, then advices the client to pay at the Municipal Treasurer’s Office | Amounts vary depending on the circuit and structure being applied for. | 15 minutes | Draftsman II, Master Plumber, Draftsman I Admin. Assistant I |
4. After payment, returns to MEO and provide s the O.R. Sits at the lobby provided for clients and waits for further information | Receives the official receipt and prepares Certificate of Final Electrical Inspection to be signed by the Building Official | None | 15 minutes | Admin. Aide IV, Master Plumber Draftsman I |
5. Receives copy of approved Electrical Permit and Certificate of Final Electrical Inspection | Approves and sign electrical permit form and Certificate of Final Electrical Inspection | None | 5 minutes | Municipal Engineer |
TOTAL: | 1 hour and 25 minutes |