Application of Certificate of Final Electrical Inspection as a requirement for Electrical Connection.

Office or Division:OFFICE OF THE MUNICIPAL ENGINEER
Classification:Simple
Type of Transaction:G2C / G2B / G2G
Who may avail:All establishments that needs Final Electrical Connection
CHECKLIST OF REQUIREMENTSWHERE TO SECURE
1. Electrical Permit Application Form and plan signed and sealed by Professional Electrical EngineerCASURECO III and Professional Electrical Engineer
2.  Proof of Ownership of lotProvided by the applicant
3.  Picture of the buildingProvided by the applicant
CLIENT STEPSAGENCY ACTIONFEES TO BE PAIDPROCESSING TIMEPERSON RESPONSIBLE
1.  Client enters the office, register at the visitors log book and submits all necessary documentsExtends greetings to client, receives and verifies application form and documentsNone5 minutesAdmin. Aide IV, Master Plumber, Draftsman I Admin Assistant.
2. Sits at the lobby provided for clients and waits for further informationIf documents are complete: Inform clients for the conduct of ocular inspection of the building If documents are incomplete:  Returns all documents and provide necessary recommendation to comply with the required documents.None45 minutesMaster Plumber and Draftsman I
3. Receives Assessment, Pay at the Mun. Treasurer’s Office then go back to Mun. Engineers’ Office and give the Official ReceiptAssessment of fees based on the National Building Code, then advices the client to pay at the Municipal Treasurer’s OfficeAmounts vary depending on the circuit and structure being applied for.15 minutesDraftsman II, Master Plumber, Draftsman I Admin. Assistant I
4. After payment, returns to MEO and provide s the O.R. Sits at the lobby provided for clients and waits for further informationReceives the official receipt and prepares Certificate of Final Electrical Inspection to be signed by the Building OfficialNone15 minutes Admin. Aide IV, Master Plumber Draftsman I
5.  Receives copy of approved Electrical Permit and Certificate of Final Electrical InspectionApproves and sign electrical permit form and Certificate of Final Electrical InspectionNone5 minutes Municipal Engineer
TOTAL: 1 hour and 25 minutes